Tender submission
Contents |
[edit] Introduction
A tender is a submission made by a prospective supplier in response either to an invitation to tender (ITT) or in response to an open tender. Tenders make an offer to supply goods or services. They will include the price for supplying the goods or services along with proposals for how the client's requirements will be satisfied – if these have been requested.
[edit] Conditions of tender submissions
Clients may impose conditions on tenderers, for example:
- To avoid restricting competition (and price fixing), tenderers may have to warrant that the prices in the tender have been arrived at independently without consultation with other tenderers;
- Prices may be submitted separately from other tender information.
- The tenderer may not directly or indirectly disclosed prices to other tenderers;
- The tenderer will not in any way try to influence other parties (individuals or firms) to either submit or not submit a tender in order to restrict competition to their advantage.
- Non-compliant tenders may be permitted, or only permitted if accompanied by a compliant tender.
- Prices may have to be broken down in a particular way to allow easy comparison with other tenders.
- Some sub-contractors or suppliers may be imposed by the cleint.
The precise content of tenders will vary considerably depending on the procurement route, however, they might include:
- A tender return slip, with details of the contract, including information such as return address and tender checklist;
- A completed tender pricing document (or contract sum analysis on design and build projects);
- Schedules of rates;
- An initial construction phase plan;
- Any design proposals or method statements that have been requested;
- Programme;
- Procedures to be adopted, such as procurement procedures and cost management procedures;
- Demonstration of capability, for example design capability, systems used etc;
- A BIM execution plan – if building information modelling is being used;
- Key project personnel, which may require submission of CVs;
- Management organisation;
- Plant and labour resources and availability;
- Prior experience, and
- References.
[edit] Getting it right
Tender submission is a process governed by a strict set of rules and requirements, some of which may seem basic but are nevertheless crucial. Failure to abide by these requirements may result in a failed tender. Some basic points to watch include:
- Ensuring the submission is not late;
- Ensuring information asked for is not missing;
- Ensuring everything is in the required format;
- Avoiding spelling and grammatical mistakes;
- Fully understanding the client’s requirements and specification, and
- Understanding obligations.
For more information see: Common mistakes in construction tenders.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Sustainable Urban Drainage and Biodiversity
Awards for champions of these interconnected fields now open.
Microcosm of biodiversity in balconies and containers
Minor design adaptations for considerable biodiversity benefit.
CIOB student competitive construction challenge Ireland
Inspiring a new wave of Irish construction professionals.
Challenges of the net zero transition in Scotland
Skills shortage and ageing workforce hampering Scottish transition to net zero.
Private rental sector, living standards and fuel poverty
Report from the NRH in partnership with Impact on Urban Health.
.Cold chain condensing units market update
Tracking the evolution of commercial refrigeration unit markets.
Attending a conservation training course, personal account
The benefits of further learning for professsionals.
Restoring Alexander Pope's grotto
The only surviving part of his villa in Twickenham.
International Women's Day 8 March, 2025
Accelerating Action for For ALL Women and Girls: Rights. Equality. Empowerment.
Lack of construction careers advice threatens housing targets
CIOB warning on Government plans to accelerate housebuilding and development.
Shelter from the storm in Ukraine
Ukraine’s architects paving the path to recovery.
BSRIA market intelligence division key appointment
Lisa Wiltshire to lead rapidly growing Market Intelligence division.
A blueprint for construction’s sustainability efforts
Practical steps to achieve the United Nations Sustainable Development Goals.
Timber in Construction Roadmap
Ambitious plans from the Government to increase the use of timber in construction.
ECA digital series unveils road to net-zero.
Retrofit and Decarbonisation framework N9 launched
Aligned with LHCPG social value strategy and the Gold Standard.
Competence framework for sustainability
In the built environment launched by CIC and the Edge.
Institute of Roofing members welcomed into CIOB
IoR members transition to CIOB membership based on individual expertise and qualifications.
Join the Building Safety Linkedin group to stay up-to-date and join the debate.
Government responds to the final Grenfell Inquiry report
A with a brief summary with reactions to their response.